Roofing Sheet

Roofing Sheets:

Metal Sheet

  • Stainless Steel Sheet (S.S Sheets)
  • Thickness :- 0.5 mm
  • Aluminium Sheet
  • Thickness :- 0.5 mm
  • GI Barrel Corrugated Sheet
  • Thickness :- 0.16 mm to 0.8mm

  • Tile Profile Sheet
  • Thickness :- 0.5 mm

Plastic Profile Sheet

FRP Sheet

FRP Sheet
Polycarbonate Sheet
Polycarbonate Sheet

UPVC Sheet
PVC Sheet

Insulated Sheets

Puff Insulated Sheet
Puff Insulated Sheet

Glass wool Insulated Sheet
XLPE Insulated Sheet
Detail Bare Zinc Aluminium (BGL) PPGL Pre painted Galvanized Iron (PPGI) Bare/Painted Aluminium Sheet
Generated by wpDataTables

Available Colours and Coating Process

Handling and Storage:

If PPGI/PPGL/PPAL products are to be stored for any time prior to forming or installation, they must be stored in dry, well ventilated conditions. Storage which allows water (including condensation) to be trapped between the sheets may damage the coating beyond repair.

Pre-painted steel products must be handled carefully during transport, fabrication and fixing to avoid damaging the surface.

Handling :

General
  • BRPL’ s products are top quality and perform best when handled correctly.
  • Don’t handle them roughly or carelessly.
  • Don’t drag or slide new sheets over other products or rough surfaces.
  • All equipment and materials taken on to the roof should be clean and care taken to prevent damaging the surface.
Use of Lifting Booms
  • Long lengths of roofing are best lifted with the aid of a lifting boom.
  • Lifting booms may be available from the profile manufacturer.
  • Ensure loads are secure prior to lifting.
Footwear
  • Anyone walking on the roof should wear flat rubber-soled footwear to prevent marking.
  • Put an old mat or piece of carpet at the base of the ladder so that shoes can be cleaned before going up on the roof.
  • Care should be taken walking on roofs as they may be slippery at times

Strippable Guard film:

Strippable film is applied to some pre-painted steel products on request of customer to protect them during transportation and roll forming. Where present, strippable film normally remains on the pre-painted steel product through roll-forming, transportation and installation but should be removed within a maximum of two weeks after fixing.

If allowed to remain on pre-painted steel for an extended period, strippable film can be difficult to remove, especially when the effects of exposure make the film brittle.

Leaving the film on for extended periods may also damage the sheet by inhibiting dust in the crevasse near the edge or where ever there is a tear in the film.

Storage:

  • Before it goes up on a roof pre-painted steel/Aluminum products can be ruined by poor storage practices.
  • Follow these simple guidelines to help give optimum performance.
  • On arrival, ensure the steel sheets are dry. If wet, open the pack immediately and separate the sheets to allow them to dry.
  • Store packs of the material off the ground in a sheltered position.
  • Cover packs with a loose fitting tarpaulin, allowing air to circulate.
  • Provide some fall to drain water.
  • Cross stacking of sheets allows air to circulate to help keep material in prime condition.
  • Use only dry, untreated timber fillets for block stacking.
  • Contact with wet concrete should be avoided.
  • Note: Failure to follow these handling and storage precautions could result in spoiling the surface appearance of the products and severely reducing their service life. On PPGI/PPGL material this could result in bubbling of the paint surface/appearance of white rust at edges/peeling/etc.. Damage resulting from such failure
  • invalidates the warranty and is not recoverable from BRPL

Do's and Don'ts of Handling of Colour Coated Sheet

Dos of Fixing
  • Do check the delivery to make sure you have the right product, delivered in prime condition.
  • Do arrange for suitable dry storage if material is not going to be used immediately.
  • Do ensure the appropriate fasteners are selected for the environment.
  • Do cut with shears or snips.
  • Do remove swart from the job as the work progresses, or at least at the end of each day.
  • Do wear clean, flat, rubber-soled footwear.
  • Do lift sheets onto the job, rather than drag them.
  • Strictly avoid surface abrasion by walking/rubbing/dragging etc. over the coated area. It will damage the coating.
Do not of fixing
  • Don't cut sheets with an abrasive disc cutter.
  • Don't attempt to attempt to solder pre-painted steel surfaces.
  • Don'ts use lead-headed nails.
  • Don't use touch-up paints unless recommended by our experts.
  • Don't leave off-cuts of other debris on the roof.
  • Don't keep sheets bundle exposed to water/moisture.

Water Ponding :

Roofs:
  1. Where the roof pitch is low, changes in roof loadings may result in a negative pitch and consequently lead to water ponding. Water ponding is detrimental to the performance of prepainted steel products. The following conditions commonly cause water ponding.
  2. Over-spaced purlins.
  3. Deformation of timber purlins.
  4. Placement of external loads such as air conditioning units.
  5. Rigid fixing on long spans which causes deformation of the profile as a result of thermal expansion
Design Guide:
  1. Never use a pitch of less than 3 degrees. Pitches of less than 3 degrees invalidate the warranty.
  2. Design the roof according to the profile manufacturer’s specifications.
  3. On minimum pitch roofs, ensure that the gutter end of profiled sheets is turned down.
  4. Allow for thermal expansion to prevent profile distortion.
  5. Consider the use of walkways to prevent damage where the roof may be subject to heavy foot traffic.
  6. Ensure roof penetrations do not block the flow of water from the roof.
Request for Quote
close slider

    Request for Quote